Process

From first sketch to moving in

We follow the RIBA Plan of Work, the stages every UK architect uses, so you always know where you are and what comes next.


Stages

Choose a stage

0

Strategic definition

We visit, listen and agree what success looks like, including the budget.

Usually takes
1 to 2 weeks
Your part
Share your brief, budget and any ideas or photos.

1

Preparation and briefing

Measured survey, planning history and a written brief we both sign off.

Usually takes
2 to 4 weeks
Your part
Arrange access for the surveyor.

2

Concept design

Two or three options as sketches and models, with rough costs for each.

Usually takes
4 to 6 weeks
Your part
Choose a direction and tell us what you love and do not.

3

Spatial coordination

The chosen design developed with engineers, then submitted for planning.

Usually takes
4 to 8 weeks
Your part
Approve the planning drawings.

4

Technical design

Construction drawings, specification and building regulations approval.

Usually takes
6 to 10 weeks
Your part
Make final choices on finishes and fittings.

5

Manufacturing and construction

We tender to trusted builders, then visit site and manage the contract.

Usually takes
3 to 12 months
Your part
Visit site with us at key moments.

6

Handover

Snagging, certificates and a building manual for your new home.

Usually takes
2 to 4 weeks
Your part
Move in and enjoy it.

7

Use

We come back after a year to see how it is working and learn from it.

Usually takes
Ongoing
Your part
Tell us honestly what you think.

Fees

What we charge

  • Extensions and conversions

    10 to 13%

    Of the build cost, for a full service from first visit to handover.

  • New houses

    9 to 12%

    Larger projects take a little less as a share of the build.

  • To planning only

    From £4,500

    Stages 0 to 3 as a fixed fee, if you want to manage the build yourself.

Architectural drawings on a desk with pens and a tape measure

Planning

Do you need permission?

  • Permitted development

    Many single storey rear extensions, some loft conversions and outbuildings need no planning application if they stay within size limits.

  • Planning permission

    Anything bigger, at the front or side, or on a house that has used up its permitted rights. Usually eight weeks for a decision.

  • Listed building consent

    Any change to a listed building, inside or out. Common in Bath, and something we do every month.

Try our quick planning check